• Lyon Engineering opens new Washington office:
    On March 1, 2009 Lyon Engineering will open its new Oak Harbor office on Whidbey Island. This office will provide engineering & surveying services to our private, commercial, and municipal clients. Look for more information on our website in the next few months.

  • City of Prescott Water System Upgrades
    The City of Prescott recently awarded Lyon Engineering a 1.25 million dollar engineering contract for infrastructure design. The projects consist of over two miles of new water and sewer trunk mains, a 3.25 million gallon tank, booster station, and region sewage lift station.

  • Napa Valley Wine Train
    Suulutaaq, Inc., an Alaska Native Owned construction company, has hired Lyon Engineering as project surveyors for the Napa Valley Wine Train (NVWT) project located in the City of Napa, CA. The project consists of approximately a mile of new railway track, roadway and utility improvements, and two new bridges. Proposed completion of the $63 million dollar project is expected in the summer of 2012.

  • Granite Dells Estates Properties
    Granite Dells Estates recently chose Lyon Engineering as their project engineer for the Granite Dells Estates (GDE) master planned community in Prescott, AZ. The GDE development will contain 550 residential lots, 67 acres of general business development, and 75 acres of industrial development. Phase 1 design is scheduled for completion in the spring on 2009.

  • Hobby Lobby
    Kitchell Development recently hired Lyon Engineering as the design engineer for the new Hobby Lobby in Prescott Valley, Arizona. Construction is estimated to begin in the spring of 2009.

  • Chino Valley Sewer Extension
    The Highlands Ranch to Chino Town Center sewer main extension project, designed by Lyon Engineering, is estimated to start construction in February of 2009. The 400 thousand dollar project consists of 4600 lineal feet of 18” sewer main to service the Town of Chino Valley. Lyon Engineering will be providing the construction management and inspection for this project

  • City of Prescott Zone 12 Water Extensions
    Lyon Engineering is the design engineer and is currently providing construction management and inspection services for the project. Construction started on November 17, 2008 and is approximately 60% complete. Asphalt Paving and Supply Inc. was awarded the contract based on their bid of approximately 1.6 million. The project consists of approximately 6,286 lineal feet of 18”-ductile iron water main, 3,434 lineal feet of 12”-ductile iron water main, two pressure reducing valve and vaults, and three jack and boring locations.